KeLing Purification Technology Company Group
|
Gold Index: 12010
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
S Type Walkable Air Shower Tunnel With PLC Control System For Semiconduction Industry
Quicky Detail:
External Size: 1300x5000x2200mm
Internal size : 800X4900X2000
Purification rank: Class100
HEPA filter efficiency: 99.999%@0.3um
Personal per cycle: 3-20 person
SUS nozzle:80 pcs
Blower way: three side blower
Air speed :>25m/s
Power: 380V/50HZ
Introduction:
The greatest source of particulate contamination in a clean room is the operator air shower are installed between change areas and the clean room, the air shower enhances clean room operating protocol by serving as a reminder to all operators that they are entering a controlled environment, personnel should be gowning up properly before entering the air shower, after you pass the air shower
Applications: Semiconductor plant, microelectronics plant, bio-pharmaceutical plant, etc
Operating features :
1: Completely self-contained, pre-wired, fully equipped Air Shower/Tunnel systems help solve decontamination problems
2: HEPA filter/blower modules (rated 99.97% efficient @ 0.3 micron particles)
wash personnel with Class 100 air to dislodge and remove particles
Solid-state microprocessor panel provides programmable control over access door operation
3: Microelelctrincs control system with LED display for the shower time.
4: the air shower duration time adjustable from 0-99second.
5: Infrared ray inductor for inside personal shower automatic from three side
6: Human being voice remind of user progress in chamber.
7: Interlocking doors minimize contamination, release automatically in the event of power failure
8: Fluorescent lighting is housed in the ceiling for minimal turbulence
9: Available in white epoxy-finished CR steel, stainless steel, or combination of
CR steel and stainless steel to meet various cleanroom requirements
10: Variety of sizes and door configurations ,Economical to operate, easy to maintai
11: Emergency switch help you out of trouble, Comply with CE Test
Parameter :
KEL-AS1300T-5Z Air Shower Tunnel |
|||
MODEL |
KEL-AS1300T-5Z |
||
External size (mm)(WXDXH) |
1300x5000x2200mm |
||
Work zone (mm)(WXDXH) |
790x4900x2000mm |
||
Persons per cycle |
3-20 person |
||
Air shower Duration |
Factory set at 12 second (adjustable) |
||
Air shower direction |
Two side with blowing |
||
Material (Option) |
1: Entirety Sus304. 2: Entirety sus201. 3: External is steel with power coated, Internal is SUS304. 4: External is steel with power coated. Internal is SUS201. |
||
Control system |
1: PCL control system with LED display for the shower time. 2: The shower time from 0-99second. (Adjustable). 3: Infrared ray inductor for inside personal shower automatic. 4: Human voice prompt system. 5: with CE remark. |
||
The power of Fan |
380V/50HZ/750W (5 sets) |
||
Air flow of fan(m3/h) |
1300m3/h |
||
Fan run (r/min) |
KeLing Purification Technology Company Group [China (Mainland)]
Business Type:Manufacturer |